Saginaw · issues
Civic issues
Topics getting the most attention in Saginaw public meetings, ranked by how frequently they come up.
Water department equipment and study funding
The agenda included purchases for the water and wastewater treatment plants — $114,624 in control hardware from Kendall Electric and $7,760 in waste disposal — plus a $36,000 railway license for a water main installation.
Water System Improvements and DWSRF Bond Financing
The city is seeking up to $9.15 million in state drinking water loans — with big chunks forgiven — to replace watermains, loop dead-end lines, and replace roughly 250 lead service lines, timed to a Perkins Street road project.
Wastewater solids handling amendment (~$29M)
The city is switching its solids-handling plan from optimizing the old lime system to a thermal hydrolysis process that cuts sludge volume up to 50%, produces Class A biosolids, and frees the city from a single hauler — no new rate increase beyond one already adopted.
Water revenue bond refunding
Refinancing $13 million in 2016 water bonds is expected to save ratepayers about $500,000 over the life of the bonds.
Cross Connection Control Program Update
Expect a green door tag — the state requires the city to inspect homes for cross-connections that could siphon contaminants into drinking water. Inspections take 10-15 minutes, and hose vacuum breakers cost $4.69 installed on your water bill.